Fast Forward Concrete Cutting recently completed a transformative project at Suite 700 Whitebox, located on the 7th floor of a commercial building on Glenoaks Boulevard in Burbank, CA.
Project Details
Project Type: Demolition
Location: 303 N Glenoaks Blvd, Burbank, CA 91502
General Contractor: Stanhope Company
Start Date: July 8 2024
Finish Date: July 24 2024
Working under the direction of the general contractor Stanhope Company, our skilled team, consisting of a foreman and four laborers, took on the challenge with dedication and precision. The project, which ran from July 8th to July 24th, 2024, was a testament to our team’s expertise and commitment to delivering top-notch results.
The scope of the work was extensive and included a variety of demolition and removal tasks. Our team began by securing the elevator lobby with 200 square feet of carpet mask protection, ensuring that the common areas remained intact and clean throughout the project. Following this, we moved on to the interior work, which involved the removal of:
- 1045 linear feet of 10′ drywall partition walls and 39 linear feet of low partition walls, ensuring the space was opened up effectively.
- 47 linear feet of glazing, 82 linear feet of upper and lower millwork, and 51 linear feet of wood shelving, all meticulously dismantled to prepare the area for its next phase of use.
- 35 doors and frames, including four double doors and frames, 1 Herculite door, and 15 sidelights, all carefully removed to maintain the integrity of the surrounding structures.
- Two sinks, demonstrating our ability to handle more technical aspects of demolition.
Our team also tackled the flooring, which involved the removal of 13,650 square feet of glue-down carpet, base, LVT, and VCT flooring, as well as 475 square feet of ceramic tile floor and mortar bed, and 715 square feet of rubber gym flooring. These tasks required precision and care, ensuring the subfloors remained intact for future use.
To facilitate the work, we utilized a rolling scaffold with wheels measuring 5′ x 10′ x 10′, allowing our team to work efficiently at various heights. Despite the demanding nature of the job, our team ensured that the entire area was thoroughly cleaned after the project was completed, leaving the space in pristine condition.
This project highlights our ability to handle large-scale commercial demolition and removal tasks and underscores our commitment to quality and customer satisfaction. The Fast Forward Concrete Cutting team worked tirelessly to ensure that Suite 700 Whitebox was ready for its next chapter, and the results speak for themselves.